G655/30/100 Grating Metal Grate Panels For Platform
Metal works repair at Blocks 1, 3, 8, 9, 14 and 17; External façade working platform set up adjacent to the tree. The Contractor has provided a Leq (30min) were used as the monitoring parameter for the time period in
Central Police Station Conservation and Revitalisation Project: 67thMo : Consulting inventory

Metal works repair at Blocks 1, 3, 8, 9, 14 and 17; External façade working platform set up adjacent to the tree. The Contractor has provided a Leq (30min) were used as the monitoring parameter for the time period in